PRODUCTION LINE FOR “Y” ROOFING BEAMS

Our production lines for “Y” beams can be equipped with hydraulic systems for automatising any erection and dismantling step. All the steps can be carried out in few minutes from the power plant, thus accelerating the production process and limiting labour costs.

All the formworks can be of a desired length and integrated with pulling heads to be inserted into ground foundation anchorage or, alternatively, rested on a self-reacting line. These prestressing systems can be integrated with multiple tensioning and automatic detensioning technologies.

The line can be further equipped with a vibrator, whether electrical with variable frequency or pneumatic with high frequency, as well as a heating and insulation system to accelerate the concrete element’s curing process.

Any coupling between formwork movable parts (such as at bottom/side walls) where there are opening and closing actions is provided with GF metal or rubber gaskets against the cement grout.